Friday, July 26, 2013

Feeling that the team has peaked too early - done with defects earlier than usual

It is an odd situation to be in. You have a product schedule, and in this schedule, you end up with your feature development work at a certain stage, and then reach a stage where the entire activity involves testing of the product. If you define this in more detail, it is the classical waterfall development model. First there is the requirements phase, followed by the design phase where the requirements are converted into design and architecture followed by the actual coding where the design is converted into code by the development team.  This code is then tested by the quality team to detect defects in this code, which follows a process of detecting defects by the testing team, getting them fixed by the development team and re-testing, and so on, till the defects have been detected to a high degree, at which the product is deemed fit to release.
You can have different development methodologies, whether these be Waterfall, iterative or Scrum, or any other. In my experience, as you move towards getting more and more functionality being coded and available to the testing team, there will come a point in the schedule where all the functionality has been built in and the team has the whole product available to do testing. It is hard to visualize a schedule where the product is being built with more and more functionality being built right till the last stages of the release.
As you have more and more parts of the product being available, you need time to do testing of the product with all the pieces connected, all the workflows being available and so on. You can have features being tested part by part as they are being built, but there will always be workflows which are not possible to test until all the pieces have been connected together.
So, in a typical development cycle, you do an estimation of the time needed for the development phase vs. the time needed for testing post development, with a lot of this estimation being done based on historical records and information, and bake this into the schedule. Accordingly, you plan for the phase where the fresh  development activity has to come to and end, and plan for getting this done in your schedule.
Once you reach that stage, it means that your team has completed all the development activity for building in the features needed in the product, and post this stage, you will only have testing and defect fixing. Seems fine, right. Unfortunately, it could be that you have done a much better job at code review, unit testing and other such activities, which resulted in your code being of a better quality than normal. What this results in is an embarrassing situation where you defect timeline is actually projected to come to an end before the due date; and this is where the manager asks the question about the team actually allocating too much time for testing and less time for feature development; since with these statistics, it is pretty clear that you could have done more feature work.
You can resolve this, although it is hard to squeeze in a new feature after you have completed testing; instead, you need to spend time reassuring the team and the manager that they have done a perfect job, that it is not a shame if you ended up completing the work before the actual timeline (although you need to incorporate this entire situation for the post-mortem and for future planning). Further, there are always important features that you were not able to plan for the current cycle, so it would make sense to actually get a head start on such features after branching the code.


Friday, July 19, 2013

Impact of any change in the final schedule date

A product development cycle can be fairly chaotic. When you hold a finished product in your hands or have it installed in your machine, the product would look great and you would not even think about the intense passion and drama that is part of the process involved in bringing out such a release. Most teams start out with a concept that this cycle of the product release will be simple, and have a lower amount of tension in the ongoing release. However, it has been my experience that a large number of such releases can be incredibly full of tension; you enjoy bringing out a product that is liked and purchased by a large number of users all over the world, but the times when you are working on the product cycle can be enjoying and frustrating at times.
One of the most tension filled times is the last week and last days of the schedule; you are this close to making the release date, you wonder whether there is anything that was forgotten; you pray to whoever you hold dear and holy that there are no major defects that come up in the last few days of the release cycle that can have an impact on the quality or the schedule of the release. In most cases, changing the release date of the product is next to impossible given the number of items that get shaken up. What happens when you have to change the release date:
- All media communication is screwed and it can end up as a PR disaster worrying people about the quality of the product
- There is a huge impact of the confidence of the senior management in the team management especially when this schedule release impact comes up suddenly
- There is a revenue impact, since as part of finance sheets, there would already have been a calculation of the revenue that will come; any change in this date will cause some shortage in the revenue sheet. If this is a major product, it could actually spiral all the way to change in earnings of the organization.
- There are many processes that are already set in motion such as DVD production, retail channels, and delivery to other partners, and all of these are impacted. For example, if your product is planned to be loaded as part of the installed software on OEM's such as the desktop or laptops of HP, Sony, Dell, etc, there will be hell to pay. These partners have finely tuned schedules and it will take some major negotiation for these schedules to be reset.
- The team would already be high-strung because it is near the end of the cycle. They are expecting a period of down and low tension for some time after the release, and if the release is delayed, this can cause morale issues within the team and continued tension.
- If you are using partners and vendors along with the core team, any delay of the schedule will also need more time for these teams. For example, vendors who provide language translation and review services can be pretty expensive, and any schedule delays will need to factor these in.

As a result of these reasons, and more like them, the team always needs to be on the ball. It would be real bad management and estimation if something happens in the last few weeks to cause the schedule to be changed. There can always be legitimate reasons for a schedule to get changed, but these should be known well in advance so that preparations for all the reasons listed out above can take place.