Tuesday, July 16, 2013

Critical to do a smoke testing of the regular build - saves time and effort

For teams that have setup a smoke test of their regular builds, the benefits are such that they may not even understand about why such a post needs to be done; after all, it seems to be obvious that if you put a smoke test to do a quick check of the regular build (in our case, it was a daily build), there are multiple advantages. The most prominent advantage is that as soon as the build is available, the smoke test can be triggered to be run automatically, which in turn will take the build through a series of tests and determine whether there is a problem that needs to be resolved.
Sounds great, right ? After all, there are all advantages to having such a smoke testing of the regular build, but a number of teams do not use it, and at the same time, there are some additional effort that does need to be added in the calculation. Let me lay out the case which we used to have. Because of the size of our code and the amount of synchronizations that needed to be done with the source safe, we would have a daily build that would kick off in the night around 11 PM and typically get done around 7 AM. Now, the problem we used to have was that it was not possible to get anybody to be there to check whether, even if the build did get formed, whether the build would even launch and whether there were any major components or workflows that were broken.
When somebody from the testing team would typically get in around 9 AM, they would check the build and then provide their feedback. Our earnest hope used to be that there no problems revealed in this check. However, once in a while, the morning verification would reveal some problems that needed to be fixed, and it would mean that the build for that day would be late or would even have to be canceled, which had some impact on the defect find / fix rate.
The ideal solution was to have a smoke test run on the daily build. Now, the problem was that thought it sounded like an ideal solution, there were some incremental efforts that we had to calculate:
- Somebody had to write the smoke test cases and integrate that with the build system to provide an email output to several members of the team about the success or failure of the smoke test
- As and when we made some changes to any of the major UI or the workflows, we would need to update the smoke test to incorporate these changes. Sometimes these would get missed, and then you would find that the Smoke test stopped in the middle of some feature, and then it would take effort to do the diagnostic of what the problem was.
- The smoke test did yield some false positives as well. The team would then have to spend some time looking for the break in the build, and also examine whether this was a genuine catch, or whether the smoke test malfunctioned, and the problem could be ignored.
- The tools for running the smoke test could be expensive and the expenditure may need to be approved by somebody who does not understand as to why there is a need for such a software, so some amount of negotiation and discussion would be needed.
- Suppose the smoke test would start running at 7:30 AM and run for around 45 minutes, somebody from the team would need to be in place or looking at the report from the smoke testing at the completion time of the smoke test, and hence there would be a rotating chair where team members would be assigned this role for a specific period.


Tuesday, June 19, 2012

What are different characteristics of build verification test?


Build verification test is often abbreviated as BVT and can be defined as a set of tests that are carried out on all the builds that are newly built in order to verify if those builds are testable or not before they are transferred to the testing team for their further testing. 
Generally, the test cases used in build verification test are considered to be the core functionality test cases which are used to keep the stability of the software systems or applications in check and regulate their testing thoroughly. 
The whole process of build verification test takes a whole lot of efforts and time if carried out manually and therefore the whole process is usually automated. If a build fails the build verification, then the same build is again returned to the developer to fix the faults. 

There are other names also by which the build verification test is known as mentioned below:
  1. Smoke testing
  2. Build acceptance testing or BAT
In a typical build verification test, there are two aspects that are exclusively tested and are mentioned below:
  1. Build acceptance
  2. Build validation

Few basics of Build Verification Tests


  1. Build verification tests are a sub set of tests that are used for the verification of the main functionalities.
  2. Some build verification tests are created on a daily basis and some builds are daily tested and if those builds fail the build verification test, they are rejected and returned back to their developer for making the fixes and when the fixes have been done, a new build is released and is gain subjected to the build verification test.
  3. The build verification test has an advantage that it saves the precious efforts of the testing team that are required for setting up a test and testing a build whenever there is a break in the major functionality of the build.
  4. The test cases of the build verification test should be designed very carefully so that they provide the maximum possible coverage to the basic functionality of the build.
  5.  A typical build verification test is run for 30 minutes maximum and not then this limit.
  6. The build verification testing can also be considered as a type of regression testing that is done on each and every build that is new.

Aim of Build Verification Test


- The primary aim of the build verification test is to keep a check on the integrity of the whole software system or application in terms of its build or we can say modules.
- When several development teams are working together on the same project, it is important that the modules that they are developing individually have got good ability for integrating with each other since this is very important. 
Till now so many cases have been recorded in which the whole project failed miserably due to a lack of integration among the modules. There are some worst cases also in which the whole project gets scraped just because of the failure in the module integration. 
- The build release has got a main task i.e., file check in i.e., including all the modified as well as new project files associated with the corresponding builds. 
- Earlier checking the health of the building initially was considered to be the main task of the build verification test. 
- This is called as “initial build health check” and it includes:

  1. Whether or not all the files have been included in the release or not?
  2. Whether all the files are in their proper format or not?
  3. Whether all the file versions and languages have been included or not?
  4. Whether the appropriate flags have been associated with the file or not?


Monday, February 27, 2012

What is build verification testing technique?

Build verification test is often abbreviated to “BVT”. This test is more commonly known as “build acceptance test”. We can make out from the term itself that this test consists of test cases that are executed on the build of a software product in order to verify that the build of that particular software system or application is testable before the software product is passed on to the testing team for testing.

ABOUT BUILD VERIFICATION TEST
- The main build verification test consists of smaller test cases and these test cases exercise the functionality of the mainstream of the software system or application.
- Any further testing on a build is performed only if it passes the build verification otherwise it is simple rejected.
- In the place of this build, the testing is continued to be carried up on the previous one.
- There should be at least one build that should pass the build verification test.
- Build verification is important to be carried out prior to the commencement of the testing phase.
- It tells the software developers whether the build of the software has been rightly developed or not.
- It also tells if the build is having any major issue.
- A build verification test also avoids time being wasted by carrying out unnecessary testing on the faulty builds.
- A typical build verification test is usually automated.
- When a build is rejected during the build verification test, it is again revered back to the software developer for correcting it.

Build verification test is also called by another name “smoke testing”. In build verification testing two aspects are mainly checked:

1. Build acceptance
2. Build validation


BASIC THINGS TESTER SHOULD KNOW ABOUT BVT

1. A build verification test consists of many smaller sub tests and each one of these tests verifies one functionality of the software system or application.
2. Build verification tests are very effective in saving the efforts of the testing team.
3. The build verification testing methodology can be used to test a build even if its major functionality are not working or are broke.
4. The build verification tests are designed very carefully so as to make them cover a major part of the functionality and features.
5. A certain time limit has been set for the build verification test to 30 minutes.
6. The testing time for running build verification should not exceed this limit.
7. Build verification testing is somewhat similar to the regression testing in the way that it is carried out on each and every build.
8. Build verification test is a way to test the integrity of the software project.
9. It checks whether or not all the modules have been integrated well with each other or not.
10. Maintenance of integrity between the modules is very important since any lag in the cooperation can cause the whole system to go bizarre.
11. Initially, the build verification testing technique was employed to check whether or not all the new features, functionality and modules have been included in the project to be released or not.
12. It also checks for the correctness of the formats of the included files.
13. Even the flags associated with a file are checked.
14. You should be very careful while deciding what all the test cases have to be carried out under the build verification test.
15. Your build verification test must include all the critical test cases and these test cases should not be unstable.
16. Another point to be kept in mind is that you should have an idea of the result of the test cases that you are including in the BVT.