The concept of software testing seems like an amalgam of similar terms, all mixed up in to each other. We all get confused sometimes between the different but similar sounding terms. 

For greater understanding of the software testing, one needs to know exactly what all the inclusive terms mean and how and where they are used or implemented. This piece of writing is dedicated to the cause of removal of such confusions. In this article we are going to clear three major concepts of software testing namely test plan, test strategy and test scenarios.

1. Test Plan

- It does the same as a normal plan would do i.e., detail out a systematic approach to the accomplishment of a certain task.
- For the test plan the task is the successful completion of a particular software testing. 
- A test plan gives a detailed approach of all the processes or activities to be undertaken during the testing.
- A test plan marks the work flow of the software testing mechanism. 
- A test plan states the strategy to be followed to make the software testing successful.
- It provides a means to check whether or not the software system or application meets all the requirements and specifications as mentioned by the client or the customer in the documentation. 
- The test plan is usually created by the testers.
- A typical test plan includes the following fields:
      (a)  Compliance test or design verification: performed on the product samples while the actual product is in development stage.
   (b)  Production test or manufacturing: performed during the assemblage process of the product for assuring quality and performance.       
      (c)  Commissioning test or acceptance: performed while the product is being installed.
      (d)  Repair test or servicing: performed during the product’s service life.
      (e)   Regression test: performed on an existing version of the product to ensure the working of the functionalities.
               
- The level of the design of the test plan depends on the complexity level of the software system or application. 
- For more complex systems high level test plans are created. 
- Apart from the above mentioned tests, a typical test plan must cover about the test methodologies, test coverage and test responsibilities. - It also states what all requirements are to be verified in the testing.

2. Test Strategy

- Test strategy forms an essential part of the test plan. 
- To put it simply we can say that the test strategy is nothing but a superficial sketch or outline of the actual test plan of the software development cycle. 
- A test strategy is developed just to inform the project developers about the approach that is to be followed during the testing. 
- The key components of a typical test strategy are objectives of the testing, test methods, test duration, resource requirements and test environment. 
- Test strategies give the description of the risk mitigation, tests to be carried out and not to forget the entry and exit criteria for the tests. 
- For each level of software testing, an individual test strategy is created.

3. Test Scenario

- Test scenarios form an essential component of the scenario testing. 
- These test scenarios provide a hypothetical measure to help the tester out of some complex problem encountered during the testing. 
- The main characteristics of a typical scenario are its complexity, credibility, motivational story with a reasonable outcome. 
- The scenarios are usually lengthy as compared to the length of the test cases probably because of more number of steps are present in a test scenario. 2 or more scenarios together make up a scenario file. 


Wednesday, May 18, 2011

What is the outline of test plan? What are test specification items?

There is an outline that should be followed while writing a test plan. It consists of the following:
- The Background
- The Introduction
- The Assumptions
- The Test Items to be tested.
- The Features to be tested.
- The Features not to be tested.
- The Approach that is to be followed.
- Item Pass/Fail Criteria which is an itemized list of expected output and tolerances.
- The Suspension or Resumption Criteria.
- Test Deliverable which includes beside software, what else would be delivered?
- Testing Tasks which consists of functional and administrative tasks.
- Environmental needs like security clearance, office space and equipment, hardware and software requirements.
- Responsibilities.
- Staffing and Training
- Schedule
- Resources
- Risks and Contingencies
- Approvals

Test specifications are developed from test plan and are a part of second phase of test development life cycle. How to implement the test cases is explained through test specifications. It consists of following:
- Case Number
- Title of Test
- ProgName which consists of program name containing test.
- Author
- Date
- Background which consists of Objectives, Assumptions, References, Success Criteria.
- Expected Errors
- References
- Data that flows between the implementation under test and test engine.
- Script


Tuesday, December 7, 2010

What comprises Test Ware Development : Test Plan - Acceptance Test Plan (ATP)

The client at their place performs the acceptance testing. It will be very similar to the system test performed by the software development unit. Since the client is the one who decides the format and testing methods as part of acceptance testing, there is no specific clue on the way they will carry out the testing. But it will not differ much from the system testing. Assume that all the rules, which are applicable to the system test, can be implemented to acceptance testing also.

Since this is just one level of testing done by the client for the overall product, it may include test cases including the unit and integration test level details.

Test Plan Outline


- BACKGROUND: This item summarizes the functions of the application system and the tests to be performed.
- INTRODUCTION
- ASSUMPTIONS: Indicates any anticipated assumptions which will be made while testing the application.
- TEST ITEMS: List each of the items(programs) to be tested.
- FEATURES TO BE TESTED: List each of the features(functions or requirements) which will be tested or demonstrated by the test.
- FEATURES NOT TO BE TESTED: explicitly lists each feature, function, or requirement which would not be tested and why not.
- APPROACH: Describe the data flows and test philosophy. This section also mentions all the approaches which will be followed at the various stages of the test execution.
- ITEM PASS/FAIL CRITERIA: Itemized list of expected output and tolerances.
- SUSPENSION/RESUMPTION CRITERIA: Must the test run from start to finish? Under what circumstances it may be resumed in the middle? Establish check-points in long tests.
- TEST DELIVERABLES: What, besides software, will be delivered? It includes test report and test software.
- TESTING TASKS: It includes functional and administrative tasks.
- ENVIRONMENTAL NEEDS: It includes security clearance, office space and equipment and hardware/software requirements.
- RESPONSIBILITIES: It includes what are the tasks in section 10? What does the user do?
- STAFFING AND TRAINING
- SCHEDULE
- RESOURCES
- RISKS AND CONTINGENCIES
- APPROVALS

The schedule details of the various test pass such as unit tests, integration tests, system tests should be clearly mentioned along with estimated efforts.