Wednesday, January 28, 2009

Properties of a test / QA / QE Manager

Testing is a vital and critical part of the overall software development process, and is very important that the overall testing environment have the right mix of aggression and thoroughness. A large amount of this attitude comes from the person who leads the testing team. So, what makes a good QA or Test manager?
There are many attributes that a good test, or QA manager should have. Here are some of them:
• The test manager should be very familiar with the software development process. This is the only way that the rest of the testing team can develop the feel for when they should be doing what activity.
• The test manager has be able to ensure that the overall enthusiasm of the team remains high, and promote a positive atmosphere, despite what is a somewhat 'negative' process (e.g., looking for or preventing problems). People should be made to feel that they have an important role in ensuring that customers get a software that works well.
• The test manager should be able to promote teamwork to increase productivity. Teamwork between the members of the testing team is critical, given that each of them may handle a separate area, and may have several elements of intersection. In addition, each person can have a different field of specialization, and together they can cover a large area.
• The test manager should be able to promote cooperation between software, test, and QA engineers. This is not so easy sometimes, but is very critical. It is a close interaction between dev and QE that results in a deeper understanding of where software can go wrong.
• The test manager have the diplomatic skills needed to promote improvements in QA processes. Sometimes software and hardware can be expensive, and management may not really understand or appreciate the need for such, and it is in such cases that the test manager can better explain.
• The test manager must have the ability to withstand pressures and say 'no' to other managers when quality is insufficient or QA processes are not being adhered to. It is the test manager who is responsible for quality.
• The test manager must have people judgement skills for hiring and keeping skilled personnel
• The test manager must be able to communicate with technical and non-technical people, engineers, managers, and customers.


Tuesday, January 13, 2009

Details (sub-parts) of a test plan !!

A software test plan is a document that is critical to any software project. This is the document that is the proper reference to the process that QE follows during the testing process. Having a software test plan is a critical requirement of quality processes, and the document by itself takes some time to prepare (given the importance of the document for the overall process). So let us talk in some more detail of what a test plan should be like:
The software project test plan document describes properties of the testing effort such as the objectives, scope, approach, and focus. One advantage of the process of preparing a test plan is that it provides a useful way to think through the efforts needed to validate the acceptability of a software product, and the consequence of this effort is that such a completed document helps people outside the test group understand the 'why' and 'how' of product validation. One major need for such a document is that it should be thorough enough to be useful, and succinct enough at the same time so that no one outside the test group will read it. The following are some of the items that might be included in a test plan, depending on the particular project:
• Title
• Identification of software including version/release numbers: Which is the software for which this document captures the test process
• Revision history of document including authors, dates, approvals: A document could go through many versions, so this field captures the current version number
• Table of Contents: Very useful, and needed for most documents
• Purpose of document, intended audience
• Objective of testing effort: What should be the goal of the testing effort
• Software product overview
• Relevant related document list, such as requirements, design documents, other test plans, etc.: A test plan by itself is not complete, since a project has different areas covered by different documents
• Relevant standards or legal requirements
• Traceability requirements: Traceability determines how the various requirements are mapped to the different test plans
• Relevant naming conventions and identifier conventions: Very useful for people not involved in the preparation of this test plan
• Overall software project organization and personnel/contact-info/responsibilties: Such a section provides contact details of the key people in the group
• Test organization and personnel/contact-info/responsibilities: The same as above, but covers people in the testing organization
• Assumptions and dependencies: Assumptions can make a lot of difference to the success and failure of a project (and its test plan) and need to be carefully validated
• Project risk analysis: Risk analysis provides a good list of items that could cause risk to the project
• Testing priorities and focus: Any testing process has certain areas of focus (high risk areas, high impact areas, high change areas), and these need to be highlighted
• Scope and limitations of testing: There are some parts of the testing that may not be able to be covered, and this section attempts to cover this part
• Test outline - a breakdown of the test approach by test type, feature, functionality, process, system, module, etc. as applicable
• Data structures - Outline of data input, equivalence classes, boundary value analysis, error classes
• Details of the Test environment - hardware, operating systems, other required software, data configurations, interfaces to other systems; all these items should be detailed so that anybody picking up the test plan will have enough information
• Test environment validity analysis - differences between the test and production systems and their impact on test validity.
• Test environment setup and configuration issues
• Software migration processes
• Software CM processes: CM stands for Configuration Management
• Test data setup requirements
• Database setup requirements: If the software requires a database, then these instructions will be needed
• Outline of system-logging/error-logging/other capabilities, and tools such as screen capture software, that will be used to help describe and report bugs
• Discussion of any specialized software or hardware tools that will be used by testers to help track the cause or source of bugs
• Test automation - justification and overview
• Test tools to be used, including versions, patches, etc.
• Test script/test code maintenance processes and version control
• Problem tracking and resolution - tools and processes
• Project test metrics to be used
• Reporting requirements and testing deliverables
• Software entrance and exit criteria
• Initial sanity testing period and criteria
• Test suspension and restart criteria
• Personnel allocation
• Personnel pre-training needs: For some cases, people doing the testing may need some special training
• Test site/location: Where will the testing be done. For some specialized equipment, the testing would need to be done at the location where the equipment is based.
• Outside test organizations to be utilized and their purpose, responsibilties, deliverables, contact persons, and coordination issues
• Relevant proprietary, classified, security, and licensing issues - These are very important from a legal point of view
• Open issues
• Appendix - glossary, acronyms, etc.
All of these sections, when completed, will provide a test plan that should be the single document that will guide the testing process


Tuesday, January 6, 2009

What to do when there is not enough time for thorough testing ?

What if there isn't enough time for thorough testing? The first answer (and applicable in a world that is more ideal) is to not be in such a situation. If you are releasing a software that is not thoroughly tested, then you are potentially sitting on dangerous ground, not knowing when and where the software could fail. However, there are cases when you are not able to spend as much time as you would like in testing the application. The rest of the article is about getting the right questions to answer if you need to determine what you should do when there is not enough time for thorough testing.
Use risk analysis to determine where testing should be focused. If the failure in a specific area could lead to a higher impact, then testing that area becomes more important.
In an ideal world, you have the time and ability to test every possible aspect of an application, every possible combination of events, every dependency, or everything that could go wrong, but in a ream world, there are constraints. Given this, risk analysis is appropriate to most software development projects. Risk analysis however is not so simple, and is a specialist field by itself requiring judgement skills, common sense, and experience. (There are training courses and other formal mechanisms that can train people to become more knowledgable in the area of risk analysis). Some of the factors or considerations that are useful when trying to estimate the procedure when you do not have enough time for thorough testing:
• Figuring out which functionality is most important to the project's intended purpose? This is a business decision and would need consulting from business analysts.
• Which functionality is most visible to the user? Users tend to be more concerned about things they can see, and those should seem to work perfectly.
• Which functionality has the largest safety impact? In this world, with legal worries about impact of software, it is helpful to make sure that areas of the application that can impact safety (human, structure, financial information) need to be tested in more detail.
• Which functionality has the largest financial impact on users? Users get real worried if their is a perception that a software flaw can have a financial effect.
• Which aspects of the application are most important to the customer? From the above points, it should be more clear as to which are the points that a tester should focus on, things that matter to consumers.
• Which aspects of the application can be tested early in the development cycle? In any development cycle, there will be parts that will be developed first, and there will be parts that will be developed later on in the development cycle. It is necessary to understand which are the items that will be available early.
• Which parts of the code are most complex, and thus most subject to errors? A part of any design and development process is the estimation of which workflows and areas of code are complex, where there is a greater chance of errors.
• Which parts of the application were developed in rush or panic mode? This is not a scenario that most people would like to see, but in rushed projects, there are parts which are developed faster (could be parts that are developed near milestones, could be components that are based on existing code and where there is a perception that this area need not have much focus).
• Which aspects of similar/related previous projects caused problems? Heuristics is a big help. Working on the basis of previous cycles and evaluating problems that came in similar situations gives a good overall pointer.
• Which aspects of similar/related previous projects had large maintenance expenses? There are many projects which are in maintenance mode, and for which there will be a large amount of data regarding problems that have cropped up, and error prone zones of the application.
• Which parts of the requirements and design are unclear or poorly thought out? Such a situation is more difficult to evaluate; the common thought in such cases is to deny that any implementation has not been well thought out, and so on. One needs to probe much deeper to find answers.
• What do the developers think are the highest-risk aspects of the application? Typically, the people who have actually developed the application are the ones who have the greatest idea about which area of the application is the most risk-prone. The dev and QE need to spend time in discussion so as to make sure that the most risky parts of the application are identified and tested.
• What kind of problems would cause the worst publicity? This is a difficult area. A part of the application that prints names improperly could be a trivial task, but could cause the application to become a laughing stock.
• What kinds of problems would cause the most customer service complaints? Customer service complaints cost money due to the need to have an active customer service, and can quickly eat away into revenue.
• What kinds of tests could easily cover multiple functionalities? Such a situation is most welcome. If tests can be tweaked in a way that the same test or series of tests can help in the testing of multiple areas of the application, that is great.

If you can add to this article, please add a comment.


Tuesday, December 23, 2008

Difference between various software testing terms

Here are some similar sounding terms that confuse most people. We need to get more clarity on what the difference between these terms is, so here is an attempt to do that. The Difference Between Quality Assurance, Quality Control, And Testing, explained below.
A large number of people are confused about the difference between quality assurance (QA), quality control (QC), and testing. These terms are closely related, but they are essentially different concepts and we need to understand the difference between them. Their being difference does not minimize the importance of all of them, and since all three are critical to managing the risks of developing and maintaining software, it is important for software managers to understand the differences. The definition of these terms is below:
• Quality Assurance: Defined as a set of activities designed to ensure that the development and/or maintenance process is adequate to ensure a system will meet its objectives.
• Quality Control: Defined as a set of activities designed to evaluate a developed work product.
• Testing: The process of executing a system with the intent of finding defects, including all the necessary planning for the testing, and just does not mean the actual execution of test cases.
QA activities ensure that the process is defined and appropriate. Methodology and standards development are examples of QA activities. A QA review would focus on the process elements of a project - such as whether the requirements are being defined at the proper level of detail. In contrast, QC activities focus on finding defects in specific deliverables - e.g., are the defined requirements the right requirements. Testing is one example of a QC activity, but there are others such as inspections. Both QA and QC activities are generally required for successful software development.
There can be disagreements over who should be responsible for QA and QC activities -- i.e., whether a group external to the project management structure should have responsibility for either QA or QC. The correct answer will vary depending on the situation, but here are some suggestions:
• While line management can and should have the primary responsibility for implementing the appropriate QA, QC and testing activities on a project, an external QA function can provide valuable expertise and perspective, and his help is in most cases, beneficial.
• There is no right value for the the amount of external QA/QC, more like it should be a function of the project risk and the process maturity of an organization. As organizations mature, management and staff will implement the proper QA and QC approaches as a matter of habit and as a result, the need for external guidance reduces, with review being more relevant.


Monday, December 22, 2008

Stages of a complete test cycle

People who are involved in the business of software testing know many parts of the testing process, but there are few people who have covered all the stages involved from the time of getting the project requirements, to the last stages of testing. Here is a timeline of the steps involved in this process:

• Requirements Phase: Get the requirements, along with the functional design, the internal design specifications
• Resourcing estimation: Obtain budget and schedule requirements
• Get into details of the project-related personnel and their responsibilities and the reporting requirements
• Work out the required processes (such as release processes, change processes, etc.). Defining such processes can typically take a lot of time.
• Identify application's higher-risk aspects, set priorities, and determine scope and limitations of tests
• Test methods: This is the time to plan and determine test approaches and methods - unit, integration, functional, system, load, usability tests, etc., the whole breakup of the types of tests to be done
• Determine test environment requirements (hardware, software, communications, etc.). These are critical to determine because the testing success depends on getting a good approximation of the test environment
• Determine testware requirements (record/playback tools, coverage analyzers, test tracking, problem/bug tracking, etc.). In many cases, a complete coverage of these tools is not done.
• Determine test input data requirements. This can be a fairly intensive task, and needs to be thought through carefully.
• People assignment: This is stage where for the project, task identification, those responsible for tasks, and labor requirements all need to be calculated.
• Find out schedule estimates, timelines, milestones. Absolutely critical, since these determine the overall testing schedule along with resource needs.
• Determine input equivalence classes, boundary value analyses, error classes
• Prepare test plan document and have needed reviews/approvals. A test plan document encapsulates the entire testing proposal and needs to be properly reviewed for completeness.
• Once the test plan is done and accepted, the next step is to write test cases
• Have needed reviews/inspections/approvals of test cases. This may include reviews by the development team as well.
• Prepare test environment and testware, obtain needed user manuals/reference documents/configuration guides/installation guides, set up test tracking processes, set up logging and archiving processes, set up or obtain test input data
• Obtain and install software releases. If a daily build is available, the smoke testing regime for build acceptance needs to be brought in.
• Perform tests. The actual phase where you start to see the results of all the previous efforts.
• Evaluate and report results
• Track problems/bugs and fixes. This phase can take up a substantial portion of the overall project time.
• Retest as needed, including regression testing
• Maintain and update test plans, test cases, test environment, and testware through life cycle


Tuesday, December 16, 2008

Types of testing

What are the different types of testing that one normally comes across ? If there are others besides these, please add in the comments.

• Black box testing - This is a testing method that is not based on any knowledge of internal design or code. Tests are based on requirements and functionality.
• White box testing - based on knowledge of the internal logic of an application's code. Tests are based on coverage of code statements, branches, paths, conditions. This is more like testing based on code, and is typically handled by a person who has knowledge of coding.
Black box and White Box testing are the 2 most well know types of testing.
In addition, there are testing carried out at different stages, such as unit, integration and system testing.
• Unit testing - the most 'micro' scale of testing; to test particular functions or code modules. This is testing that happens at the earliest stage, and can be done by either the programmer or by testers (further stages of testing are typically not done by programmers). Not always easily done unless the application has a well-designed architecture with tight code; may require developing test driver modules or test harnesses. It could also be used to denote something as basic as testing each field to see whether the field level validations are okay.
• Incremental integration testing - this stage of testing means the continuous testing of an application as and when new functionality is added to the application; the testing requires that various aspects of an application's functionality be independent enough to work separately before all parts of the program are completed, or that test drivers be developed as needed; this testing is done by programmers or by testers.
• Integration testing - This form of testing implies the testing of the combined parts of an application to determine if they function together correctly. When we say combined parts, this can mean code modules, individual applications, client and server applications on a network, etc. Integration testing can reveal whether parts that seem to be well built by themselves work properly when they are all fitted together. Integration testing should be done by testers.
• Functional testing - Functional testing means testing of Black-box type testing geared to functional requirements of an application; functional testing should be done by testers. Functional testing is geared to validate the work flows that happen in the project.
• System testing - System testing is a black-box type of testing that is based on testing against individual overall requirements specifications; the testing covers all combined parts of a system and is meant to validate the marketing requirements for the project.
• End-to-end testing - End to end testing sounds very similar to system testing just with the name itself, and is similar to system testing. The testing operates at the 'macro' end of the test scale, at the big picture level ; end-to-end testing involves testing of the complete application environment in a situation that simulates the actual real-world use, the final use, (example, interacting with a database, using network communications, or interacting with other dependencies in the system such as hardware, applications, or systems if appropriate).
• Sanity testing - Sanity testing, as it sounds like, is typically an initial testing effort to determine if a new software version is performing well enough to accept it for a major testing effort. This sort of testing could also happen on a regular basis to ensure that regular builds are worth testing. For example, if the new software is crashing systems every 5 minutes, bogging down systems to a crawl, or destroying databases, the software may not be in a 'sane' enough condition to warrant further testing in its current state. Sanity testing is not supposed to be a comprehensive testing.
• Regression testing - Regression testing plays an important part of the bug life cycle. Regression testing involves re-testing after fixes or modifications of the software or its environment. It can be difficult to determine how much re-testing is needed, especially near the end of the development cycle, but there should never be an attempt to try and minimise the need for regression testing. Automated testing tools can be especially useful for this type of testing.
• Acceptance testing - Acceptance testing, as the name suggests, is the final testing based on specifications of the end-user or customer, or based on use by end-users/customers over some limited period of time. This type of testing can also mean the make or break situation for a project to be accepted.
• Load testing - Again, as the name suggests, load testing means testing an application under heavy loads, such as testing of a web site under a range of loads to determine at what point the system's response time degrades or fails. This is part of a system to ensure that even when a system is under heavy load, it will not suddenly collapse, and can help in infrastructure planning.
• Stress testing - Stress testing is a term often used interchangeably with 'load' and 'performance' testing. Stress testing is typically used to describe conducting tests such as system functional testing while under unusually heavy loads, heavy repetition of certain actions or inputs, input of large numerical values, large complex queries to a database system, etc.
• Performance testing - Performance testing is a term often used interchangeably with 'stress' and 'load' testing. Ideally 'performance' testing (and any other 'type' of testing) is defined in requirements documentation or QA or Test Plans. Performance testing is also used to determine the time periods involved for certain operations to take place, such as launching of the application, opening of files, etc.
• Usability testing - Usability testing is becoming more critical with a higher focus on usability. Usability testing means testing for 'user-friendliness'. Clearly this is subjective, and will depend on the targeted end-user or customer. User interviews, surveys, video recording of user sessions, and other techniques can be used. This is done ideally through the involvement of specialist usability people.
• Install/uninstall testing - testing of full, partial, or upgrade install/uninstall processes. Given that the first thing users see is an installer, how the installer works, whether people are able to get clarity, and so on are some of the measurements through installer testing. In addition, the install / uninstall / repair etc should work smoothly.
• Recovery testing - One does not like to anticipate such problems, but given that crashes or other failure can occur, recovery testing measures how well a system recovers from crashes, hardware failures, or other catastrophic problems.
• Security testing - Security testing is getting more important now, with the focus on increased hacking, and security measures to prevent data loss. Security testing determines how well the system protects against unauthorized internal or external access, willful damage, etc and may require sophisticated testing techniques.
• Compatibility testing - Compatibility testing determines how well the software performs in a particular hardware/software/operating system/network/etc environment.
• Exploratory testing - This type of testing is often employed in cases where we need to have a creative, informal software test that is not based on formal test plans or test cases; testers may be learning the software as they test it, common in situations where the software being developed is of a new type.
• Ad-hoc testing - similar to exploratory testing, but often taken to mean that the testers have significant understanding of the software before testing it.
• User acceptance testing - determining if software is satisfactory to an end-user or customer. Similar to the acceptance test described above.
• Comparison testing - Comparison testing means comparing software weaknesses and strengths to competing products, very important to evaluate your market, and to determine which are the features you need to develop.
• Alpha testing - testing of an application when development is nearing completion; minor design changes may still be made as a result of such testing. Typically done by end-users or others, not by programmers or testers.
• Beta testing - Also called pre-release testing, it is the testing when development and testing are essentially completed and final bugs and problems need to be found before final release. Typically done by end-users or others, not by programmers or testers. The advantage is that you can test with users, as well as get verification about software compatibility on a wide range of devices.
• Mutation testing - a method for determining if a set of test data or test cases is useful, by deliberately introducing various code changes ('bugs') and retesting with the original test data/cases to determine if the 'bugs' are detected. Proper implementation requires large computational resources.


Tuesday, December 9, 2008

Some testing definitions

Some definitions of key testing terms:

What is software 'quality'?
Trying to attain software quality implies being able to meet the following goals: reasonably bug-free, delivered on time and within budget, meets requirements and/or expectations, and is maintainable. It is not easy to objectively define quality. It will depend on who the 'customer' is and their overall influence in the scheme of things. if you were to take a holistic view of the customers, you would involve the following people: end-users, customer acceptance testers, customer contract officers, customer management, the development organization's management/accountants/testers/salespeople, future software maintenance engineers, stockholders, magazine columnists, etc. Each type of 'customer' will have their own slant on 'quality' - the accounting department might define quality in terms of profits while an end-user might define quality as user-friendly and bug-free.

What is the 'software life cycle'?
A software life cycle is one of the most popular terms that a person working in software is expected to know. The life cycle begins when an application is first conceived and ends when it is no longer in use. The various in-between parts of the life cycle is enough to fill a separate book, but as a first level, the terms includes aspects such as initial concept, requirements analysis, functional design, internal design, documentation planning, test planning, coding, document preparation, integration, testing, maintenance, updates, retesting, phase-out, and other aspects.

What is 'Software Quality Assurance'?
Software QA involves the entire software development paradigm from beginning to end - monitoring and improving the process, making sure that any agreed-upon standards and procedures are followed, and ensuring that problems are found and dealt with. It is oriented to 'prevention', to ensuring that such processes are defined that make it more difficult to get into problems.

What is 'Software Testing'?
When a software is written by developers, it is a given that there will be sections that will not be working properly. Testing involves operation of a system or application under controlled conditions and evaluating the results (eg, 'if the user is in interface A of the application while using hardware B, and does C, then D should happen'). The controlled conditions should include both normal and abnormal conditions, and can cover a wide gamut of activities. Testing should intentionally attempt to make things go wrong to determine if things happen when they shouldn't or things don't happen when they should. It is oriented to 'detection'.